Description
This is the 10-piece pack of the PF10-03-P01; the optic is identical to the single-unit version.
Product Overview
Ten discs, each Ø25.4 mm of fused silica at 6.0 mm thickness, each carrying a protected silver film with 97% average reflectance from 450 nm to 2 µm and 95% from 2 µm to 20 µm, each figured to λ/10 at 633 nm and polished to 40-20 scratch-dig, each with a 22.9 mm clear aperture, a fine-ground rear face and a laser-engraved item number. The pack changes the quantity on the purchase order and nothing about the optic.
Buying ten is a production decision rather than a discount decision, and it is worth being honest about which production problem it solves. Optics on a working machine do not usually fail optically. They get contaminated: a fingerprint during a lens change, a splash from a coolant line, a film of condensed oil mist after three months in an enclosure, a scratch from a tissue dragged across grit. In every one of those cases the optic is not worn out, it is dirty, and the difference between a film you may wipe and a film you may not is the difference between a five-minute intervention and a stopped machine waiting on a purchase order. Ten on the shelf converts a contamination event into a consumable event, which is a much cheaper category to be in.
The second problem a pack solves is consistency across stations. A machine with four turning points, or a line with eight heads, will drift apart if each mirror arrives on a separate order months apart: different coating runs, different storage history, different handling by whoever opened the bag. One pack means one coating run, one transit, one storage regime, and a set of parts that can be swapped between stations without anybody wondering whether the replacement is the same thing as the original. That property has no line on a datasheet and it is the single strongest argument for kitting a build from a pack.
The third is time. A spare within reach removes the argument about who contaminated the mirror, the inspection that decides whether it is worth cleaning, and the two-week wait while a replacement crosses a border. A service engineer who arrives with a sealed pack restores a beam path in an hour. An engineer who arrives without one diagnoses the fault correctly and then waits, which is the most expensive outcome in the whole sequence because the diagnosis was already paid for.
What a pack does not fix is a wrong coating choice. Ten of the wrong part is a larger mistake than one of the wrong part. If the layout carries a visible pointer below 450 nm, or sits in a condensing atmosphere where silver tarnishes faster than the maintenance interval, buying ten protected silver mirrors simply spreads the error across ten positions. Settle the coating question first, then decide how many to hold. The comparison table further down is there for exactly that reason.
Storage is the discipline that decides whether the pack actually delivers its value. Ten coated optics in one bag will scratch each other if they are left loose, and two coated faces in contact will mark each other under nothing more than their own weight. Keep them in the original cases or in a slotted tray, faces never touching, tray closed, and let a cold pack come to room temperature before opening it in a humid room so that condensation does not form on a surface that is still at transport temperature. A pack that has been opened and left open in a workshop is ten dirty mirrors with a shared history.
Key Features
- Ten optics, one part number, one coating run: every turning point on a machine or a line starts from the same deposition batch, so a replacement is genuinely a replacement
- Pack size 10 pieces: sized for a small line, a shared teaching bench or a service kit, which are the three places where single units run out at the wrong moment
- Protected silver, 97% from 450 nm to 2 µm and 95% to 20 µm: the broadband film that covers a visible pointer and a 1064 nm working beam through the same fold
- Wipeable SiO₂ overcoat: the property that matters most when several people share the same optic, because it is what makes routine cleaning permissible at all
- λ/10 at 633 nm, 40-20 scratch-dig: identical optical grade to the single unit, so a spare is a drop-in and not a downgrade
- Laser-engraved item number on every rear face: after the bag is opened and ten discs are spread across a bench, an unmarked disc is an unknown disc, and the engraving ends that
- Ø25.4 mm by 6.0 mm, tolerance plus or minus 0.2 mm: seats in the standard one-inch mounts already on the machine, with no adapter and no new part number in the mount bill
- Specified from 0 to 45 degrees: the same optic serves a normal-incidence fold and a 45 degree turn, which is what allows one pack to cover a whole layout
Technical Specifications
| Model | PF10-03-P01-10 |
| Pack size | 10 pieces |
| Coating | Protected silver (silver film with SiO₂ protective overcoat) |
| Wavelength range | 450 nm – 20 µm |
| Average reflectance, 450 nm – 2 µm | 97% |
| Average reflectance, 2 – 20 µm | 95% |
| Angle of incidence | 0 to 45 degrees |
| Substrate | Fused silica |
| Diameter per optic | Ø25.4 mm (Ø1 in) |
| Diameter tolerance | +0.0 mm / -0.1 mm |
| Thickness per optic | 6.0 mm (0.24 in) |
| Thickness tolerance | plus or minus 0.2 mm |
| Surface flatness | λ/10 peak to valley at 633 nm |
| Surface quality | 40-20 scratch-dig |
| Parallelism | 3 arcmin or better |
| Clear aperture | 90% of diameter (Ø22.9 mm) |
| Rear surface | Fine ground, laser engraved with the item number |
| Damage threshold, pulsed | 0.225 J/cm² at 800 nm (99 fs, 1 kHz, Ø0.167 mm); 1 J/cm² at 1064 nm (10 ns, 10 Hz, Ø1.010 mm) |
| Damage threshold, CW | 500 W/cm at 1.07 µm (Ø0.974 mm); 1500 W/cm at 10.6 µm (Ø0.339 mm) |
| Mounting | Standard Ø1 in optic mounts and retaining rings |
| Source | Manufacturer published series specification table |
Applications
These are the situations where holding ten earns its shelf space. They are all procurement and uptime situations, because the optical question was settled when the coating was chosen.
- Multi-shift production cells: when the same fold mirror is handled by three shifts, a spare within reach removes both the delay and the argument about who touched it last
- Pilot lines and first-article builds: a new machine is commissioned from a known-good set, and any optic handled during commissioning is replaced rather than inspected
- Field service kits: a sealed pack in the van turns a two-week lead time into an hour of work, which is the difference between a repair and a shutdown
- OEM build kits: ten per build, kitted with the mounts, so the assembly cell never runs short halfway through a batch
- Shared teaching laboratories: every session ends with a fingerprint on something, and a drawer of spares keeps the next session from starting with an apology
- Dusty or fume-laden enclosures: cutting, welding and engraving cells throw particulate and oil mist at every optic in the box, and a film that can be wiped is the only film that survives that regime
- Spare-part commitments: an agreed holding of ten is a support promise a customer can audit, and it is cheaper than expediting single units twice a year
Selection Guide
How many to hold is a question about failure rate and lead time, not about price per unit. The table gives a starting point for the common cases; adjust upward if the site is remote or if the process is dirty.
| Situation | What goes wrong with singles | Reasonable holding |
|---|---|---|
| One machine, two to four turning points | One contaminated optic stops the machine while a replacement is ordered | 4 to 6 pieces |
| A line of four to eight heads | Mirrors migrate between heads and nobody can say which head holds which optic | 10 to 16 pieces |
| A teaching lab shared by several groups | Every session ends with a fingerprint and there is no spare in the cupboard | 10 pieces, held centrally |
| A service organisation with several vans | Each call-out carries a delivery risk on top of the repair risk | 10 pieces per kit |
| An OEM building ten or more machines | Kitting from singles adds a purchase order per machine | One pack per build |
| A single prototype bench | Nothing, if the optic is not touched | One or two singles |
Two rules make a pack work in practice. First, label the mount, not the optic: write the item number on a tag beside each fold point so that a swap is recorded without anyone having to read an engraving inside a closed enclosure. Second, measure the first article out of the pack and write the number down. Individual parts vary slightly across the band because 97% is an average rather than a guarantee at every wavelength, and a power budget that closes tightly should be built on a measurement of the actual delivered part, not on the catalogue average.
Series Comparison
The same pack format exists across the one-inch metal coatings, which means a line can standardise on a pack size and vary only the film. The values below are per optic, identical in either pack or single form.
| Pack item | Coating | Band | Ravg | Cleanable |
|---|---|---|---|---|
| PF10-03-P01-10 | Protected silver | 450 nm – 20 µm | 97% / 95% | Yes |
| PF10-03-G01-10 | Protected aluminum | 450 nm – 20 µm | 90% / 95% | Yes |
| PF10-03-M01-10 | Protected gold | 800 nm – 20 µm | 96% | Yes |
| PF10-03-M02-10 | Mid-infrared enhanced gold | 2 – 20 µm | 98% | Yes |
| PF10-03-M03-10 | Unprotected gold | 800 nm – 20 µm | 97% | No |
| PF10-03-F01-10 | UV-enhanced aluminum | 250 – 450 nm | 90% | Yes |
One warning that matters more in a pack than in a single: the protected and unprotected gold parts look identical in a mount. If a site holds both, the unprotected one must never be wiped, and a technician who has been told that all the fold mirrors can be cleaned will eventually clean the wrong one. Colour-code the mount, not the optic.
FAQ
Q: Why would anyone buy ten of one mirror?
A: Because the failure that actually happens is contamination, not wear, and contamination arrives in bursts. One spill, one shift change or one enthusiastic cleaner can take out three optics in an afternoon. Ten is roughly two years of that rate on a small line, and the cost of holding them is a shelf rather than a capital project.
Q: Are all ten optically identical?
A: They meet the same specification and normally come from the same coating run, but a specification is a window and not a single value. 97% is an average across 450 nm to 2 µm, so individual parts differ slightly with wavelength. For a tight power budget, measure the first article and treat that measurement as the number for the whole pack.
Q: Can I split a pack across two machines?
A: Yes, and it is a sensible way to cover two heads that share a build. What you lose is the audit trail, because five discs go to one site and five to another and the engraving no longer maps to a single installation. Write down the split at the moment you make it; reconstructing it a year later from memory is not reliable.
Q: How should ten coated optics be stored?
A: Separately, in the original cases or a slotted tray, never face to face and never loose in a bag. Two coated surfaces in contact will scratch each other under their own weight alone. Keep the tray closed and dry, and let a cold pack reach room temperature before opening it in a humid room.
Q: Does the pack come with matching serials or certificates?
A: Each optic carries a laser-engraved item number on the rear face, which identifies the part rather than an individual unit. If your quality system needs unit-level traceability with a certificate per piece, say so before ordering, because that is a different commercial arrangement from a standard ten-pack.
Q: What is the realistic shelf life?
A: Years, if the pack stays sealed and dry. Silver is the vulnerable element: the SiO₂ overcoat slows tarnish but does not seal it, so a pack stored in an unheated room through a wet season can show edge discolouration even though it was never used. Store above dew point, keep the desiccant fresh, and inspect the first unit before committing the rest to a build.
Q: Should I buy the pack if I only need two now?
A: Only if the two are going into a machine that will need more later. Otherwise buy two singles and keep the money. A pack is a stocking decision, and stocking a part you may replace with a different coating next quarter is a way of owning inventory you will never use.
Usage Precautions
- Open the pack once, on a clean bench, and transfer the discs into a slotted tray immediately. Do not leave ten optics in an open bag on a machine frame.
- Never stack them face to face, and never rest one coated side down on a bench, even for a moment, even on a lens tissue.
- Handle by the rim with gloves or finger cots. A fingerprint on protected silver leaves a residue that etches into the overcoat, and the local reflectance never fully recovers.
- Tighten retaining rings only until the disc stops moving. A metal ring tightened onto a 6 mm substrate bends a surface specified at λ/10, and the astigmatism that follows is usually blamed on the laser.
- Log every swap against the fold point, not against the pack. Ten identical engravings are useless for diagnosis unless the installation record says which one went where.
- Keep one optic sealed as a reference. When a power loss is suspected, comparing against a known-good unit separates a dirty mirror from a failing laser in a single substitution.
- Do not clean a mirror that only looks dusty under a torch. Inspect under oblique light, and if the beam is clean leave the surface alone; wiping is a risk you take for a reason.
- Discard, do not refurbish. A mirror with a scratch through the coating cannot be polished back to specification, and a scratched optic kept in the tray will eventually be installed by someone in a hurry.
Disclaimer
Specifications on this page are compiled from the manufacturer published series tables and are offered for selection purposes only; the current official datasheet governs. Pack contents, coatings and markings may change without notice. Price, pack discount and delivery are quoted separately by our sales desk.
Contact Us
Tell us how many turning points the machine has, how often the optics are handled, whether the enclosure is dirty and what lead time you can tolerate, and we will suggest a holding rather than simply selling you ten. If the site holds both protected and unprotected films, say so, and we will include the labelling advice that keeps them apart. Project quantities and annual agreements are quoted individually.









Reviews
There are no reviews yet.