Introduction
The global AI compute arms race keeps heating up, and the optical module industry has reached a historic breakout point. NVIDIA recently announced a strategic investment of USD 2 billion in Lumentum, optical module capacity is running short, and the 1.6T era is arriving at an accelerating pace.
Key Takeaways
- NVIDIA’s heavy bet: NVIDIA is making a strategic investment of USD 2 billion in Lumentum, underscoring the strategic weight it places on the optical module industry
- Capacity sold out: Lumentum’s CEO said full-year 2028 capacity sold out within two quarters, and the upcycle should last at least 5 years
- Raw materials surging: InP (indium phosphide) substrate prices have tripled, with 2-inch wafers jumping from USD 800 to USD 2,300, further intensifying the supply-demand tension
- 1.6T module demand explodes: Citi raised its forecast, lifting 2026 shipments from 8 million units to more than 20 million units
- Demand concentrated among giants: NVIDIA alone needs close to 5 million units and Google about 4 million units, with top customers buying in a monopolistic pattern
Industry Watch
NVIDIA’s massive investment shows that optical modules, as the core devices of AI compute interconnect, are being upgraded from “supporting role” to “lead role”. As 1.6T technology matures and capacity expands, optical module makers will enter a golden growth period, but raw material supply bottlenecks still warrant attention.
Source: OFweek Optics Network



Leave a Reply